BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//The Engineering Society of York - ECPv6.16.3//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://tesoy.org
X-WR-CALDESC:Events for The Engineering Society of York
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20200308T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20201101T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20210314T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20211107T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20220313T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20221106T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20211122T170000
DTEND;TZID=America/New_York:20211122T183000
DTSTAMP:20260608T044256
CREATED:20211110T190625Z
LAST-MODIFIED:20211115T134336Z
UID:1530-1637600400-1637605800@tesoy.org
SUMMARY:Tour of Brillhart Pumping Station
DESCRIPTION:Join us for a tour of York Water Company’s Brillhart Pumping Station! \nHearing protection is required. \nAttendance will be limited to 20 people. \nCost:  $10 Member\, $15 Guest \nHistory of Brillhart Pump Station \n1849 – Steam Pumping Station on Codorus Main Branch at Kings Mill Road and Penn Street \n1896 – Construction of new Steam Pumping Station on the Codorus South Branch \n\nPurer water source upstream from confluence with the West Branch\nLarger pumping capacity\nLocation along railroad track for coal supply\n\n1899 – Construction of first Filtration Plant on Grantley Hill \nRock Crib Dam with 12 CFS Conservation Release \nWater Quality Monitoring: \n\nTurbidity (High & Low)\nTemperature\npH\nConductivity\nTreatment:\nScreening\nPotassium Permanganate\n\nPumping: \n\nRetired Steam Pumps: 5 MGD\nPump 5 – 1000 HP\, 16 MGD (11\,100 GPM)\, Installed 2011\nPump 6 – 1000 HP\, 16 MGD (11\,100 GPM)\, Installed 2011\nPump 7 – 300 HP\, 4 MGD (2800 GPM @ 307’)\, Installed 2021\nPump 8 – 300 HP\, 4 MGD (2800 GPM @ 307’)\, Installed 2021\nPump 9 – 300 HP\, 4 MGD (2800 GPM @ 307’)\, Installed 2021\n\nProduction: \n\nAverage: ~ 20 MGD\nMaximum: ~ 38 MGD\n\nTransmission: \n\nDual 24” Dia Iron Transmission Mains (Pumps 7-9)\nSingle 36” Dia Concrete Transmission Main (Pumps 5 & 6)\n\nElectrical (2021): \n\nSubstation / Transformers:13\,200 VAC – 2\,400 VAC\nGenerator: 2 MegaWatt
URL:https://tesoy.org/event/tour-of-brillhart-pump-station/
LOCATION:Brillhart Pump Station\, 2325 Croll School Rd\, York\, PA\, 17403\, United States
END:VEVENT
END:VCALENDAR